Phase 2 Building Pads: Sewer, Water and Storm Drain Lines

Work continues this month as the pads for the Phase 2 buildings are completed, and underground utilities on-site installation continues.  A total of 1267 linear feet of storm drain, 1,421 linear feet of sanitary sewer, and 1,313 linear feet of water pipe are being installed

.

Building pad
Utility trench excavation
Storm drain pipes